SARAVANARAJ M
PMC-Senior Site Engineer at Vistar AEC Consultants LLP
- Tiruchirappalli, Tamilnadu, India
- sarancivil6@gmail.com
- +91 96773-14133
To Seeking Creative and Challenging Position to Develop Technical, Innovative, and Logical Skills for Organizational Growth.
Experience
Residential and Commercial buildings
Jun 2016 – Dec 2018
- Ensured the accuracy of building plans and drawings, resulting in cost avoidance for revisions and enhanced project efficiency.
- Managed onsite labor and operations effectively, leading to improved productivity and on-time project completions.
- Calculated material quantities with precision, facilitating better resource allocation and achieving significant cost savings.
- Oversaw labor billing processes, ensuring accurate and timely payments that bolstered workforce relations.
Service Apartments
Dec 2018 – Mar 2019
- Studied and verified the accuracy of project plans and GFC drawings to ensure compliance with specifications, resulting in improved project quality and reduced rework costs.
- Managed site operations and labor resources effectively to enhance productivity, contributing to timely project completion and cost savings.
- Calculated material quantities meticulously to optimize resource allocation, leading to minimized waste and improved budget adherence.
- Oversaw BBS preparation and reconciliations to maintain supply chain efficiency, which resulted in reduced steel wastage and enhanced project sustainability.
- Marked and monitored concreting activities diligently to uphold safety and quality standards, achieving a significant decrease in construction errors and delays.
APRON ,Taxi way, Road and air side facilities
Mar 2019 – Mar 2020
- Executed project planning and LEVELs checks, ensuring precise implementation while maximizing efficiency and minimizing project delays.
- Oversaw subgrade preparation and laid WMM and DRLC, meticulously reporting levels to guarantee quality control and adherence to specifications.
- Led PQC concrete laying operations, enhancing work quality through stringent monitoring which resulted in increased structural durability.
- Compiled comprehensive daily progress reports for management review, fostering transparency and informed decision-making throughout the project lifecycle.
- Monitored the supply chain for materials, equipment, and machinery, ensuring continuous workflow and reducing downtime due to material shortages.
Construction link parallel taxi track (Phase II) and grading of basic strip at south side
Apr 2020 – Apr 2021
- Executed highly embankment filling works to ensure structural integrity and enhance land stability, resulting in improved site safety and reduced erosion risks.
- Performed para link laying, gravel filling, grading, and density checks to establish a solid groundwork, achieving optimal surface conditions and durability for future development.
- Layed geo composites in critical slope areas to mitigate landslide risks, leading to enhanced slope stability and long-term environmental protection.
- Conducted drain pipe drilling and installed woven geo textile to facilitate effective water management, thereby preventing water accumulation and associated damages.
- Oversaw Gabion wall fabrication and soling filling arrangements to fortify the site against erosion, resulting in strengthened land defenses and extended project lifespan.
MAPAL Green Field Projects
Apr 2021 – Jun 2022
- Studied and verified the accuracy of project plans and GFC drawings to ensure compliance and enhance overall project efficiency, resulting in a significant reduction in rework and project delays.
- Managed site operations and labor resources effectively, leading to improved productivity and streamlined project timelines.
- Calculated material quantities and implemented BBS and reconciliation procedures that minimized waste, contributing to cost savings and sustainable material usage.
- Executed structural and finishing work with precision, ensuring high-quality outcomes that met client specifications and industry standards.
- Oversaw road work execution, including GSB levelling and paver block laying, achieving optimal surface quality and durability in infrastructure projects
Integrated Bus Terminal and Multi Utility Facilities Center
Jul 2022 – Mar 2023
- Coordinated technical aspects of construction projects, enhancing project efficiency by streamlining processes and reducing delays.
- Identified and resolved technical issues promptly, which led to increased project reliability and stakeholder confidence.
- Prepared comprehensive reports and provided expert advice, contributing to informed decision-making and successful project outcomes.
- Oversaw security, health and safety protocols, ensuring a safe working environment and compliance with regulations.
- Organized and supervised materials and personnel effectively, resulting in optimized resource utilization and improved team productivity.
