Skip to main content

Raja Elvis M

LOTO & Permit Specialist at Emirates Global Aluminium, UAE.

22+ years of experience managing production, Quality, Safety & Cost control in large scale manufacturing industries. Verifiable strengths in Lock Out Tag Out procedures & task risk analysis. Conversant in the Implementation & Practice of quality standards ISO 9001, 14001 & 45001. A strong player able to train and motivate teams to peak performance.

Experience

LOTO & Permit Specialist

 Accountable for isolation and permitting activities during planned

preventive maintenance, shutdown maintenance and breakdowns

including scoping of work and ensuring compliance with standards,

protocols and operating procedures to minimize and / or mitigate

risk of injury or damage to the plant.

Shift Leader - Manufacturing

 Shift Lead of Mirror plant producing 5.0 Million Sq.M of best in class

Clear & Tinted Mirrors witha team size of 30 Personnel including 10

Engineers.

 Responsible for achieving top performance goals like Volumes, MFG

cost, controlling high value production consumables & savings

through cost savings projects.

Production In Charge

 Production in Charge for “On Time Delivery” of Zeolite.

 Handling an entire Operations team of 24 Personnel including 02

Engineers and reporting to DGM (Operations)

 Preparation of Operation and Maintenance Manuals

 Day to day Data Analysis for Plant Stabilization & Optimization

Production Officer

 Shift in Charge for Alumina refinery process includes precipitation,

Filtration & Calcination with a team size of 15 workmen and 2

Foreman.

 Monitoring and controlling the process parameters aimed at 240

TPD of Alumina.

 Co-ordinate with Mtc Dept on Machinery Trouble shootings

& Preventive \ Predictive Mtc.

Projects

co-ordinate with the project team in the erection and commissioning of pan filter seconded from hindustan zinc.

  • project scheduling
  • supervision
  • training plant operating personnel
  • safety management

co-ordinate with acc in the retrofitting project (waste heat recovery) of rotary kiln and thereby achieving the increase of production from 75 tpd to 115 tpd.

  • making protocols and projects schedule reports

successful completion of commissioning of sodium aluminate plant without the help of process consultants in oman chemical industries.

  • liaison with technical consultants, engineers and suppliers

introduced “weighing system” to eliminate “lite count” issue in mirror sheets crate packing.

  • data collection
  • installation & commissioning

Awards

Awarded with Annual excellence award 2011

Led the team for the record breaking production volumes.

Awarded with Annual excellence award 2009 - 10

Led the team for the implementing cost saving projects.

Awarded with Annual excellence award 2008

Successful completion of two six sigma projects with the validated benefits of 5.0 Million Per annum.

Rewarded by CEO Kitty

Maintained the quality of alumina during Export by effective process control.

Rewarded as a BEST EMPLOYEE OF THE MONTH

Designed and devised a mechanized packing system for Hydrate export which helped reducing Man power and stress while packing in Jumbo bags.

Rewarded with a Spot Award

Led the daily permit to work meetings with the operations & maintenance team for prioritizing and planning of critical activities for safe execution.