Mohamed Salman khan. A
Civil Supervisor at Tabeer Arabia
- karaikudi, Tamil Nadu, India
- mohamedsalmankhan361@gmail.com
- +966 564371660
I am motivated individual with four years professional experience in the construction field. I bring success due to a proven track record of excellence, developed comprehensive strategies and taken initiative. I have a demonstrated ability to exceed expectations and achieve set goals. With my focus and results-oriented approach, I am confident
Experience
Civil engineer
Supervised concrete forming and casting for water tank construction, managed Bill of Quantities (BOQ) and Bar Bending Schedule (BBS) for steel reinforcement, and maintained comprehensive Bill of Works as a Quantity Surveyor.
Civil engineer
- Led the civil work for the L&T camp renovation project (Aramco) resulting in timely completion while adhering to the highest industry standards.
- Conducted regular inspections of ongoing work ensuring compliance with safety regulations and project specifications.
- Coordinated with contractors and stakeholders to optimize project workflow and enhance overall efficiency.
- Prepared comprehensive reports on project progress which facilitated informed decision-making and proactive problem-solving.
- Implemented quality control measures during construction leading to significant reductions in rework and increased client satisfaction.
Civil supervisor
I have experience in pipeline projects at Aramco, focusing on backfilling tasks. My role involved preparing daily progress reports (DPR) and overseeing work arrangements. I am proficient in enforcing safety protocols. conducting Toolbox Talks (TBT), and ensuring all personnel adhere to PPE requirements. I am well-versed in obtaining and managing various permits such as hot, cold, and confined space entry permit, prioritizing daily and weekly permits based on site conditions and ensuring thorough approvals.
Site Engineer
A site engineer is responsible for the planning, coordination, and supervision of construction projects from inception to completion. This includes interpreting project plans and specifications, managing resources, ensuring that work is carried out according to design and quality standards, and adhering to safety regulations. They also oversee the progress of subcontractors, resolve any on-site issues, and maintain clear communication with project stakeholders. Additionally, they are involved in scheduling, budgeting, and ensuring the timely completion of the project while maintaining high standards of workmanship.
Projects
independent sewer treatment plant

Earthworks & Foundations : Supervising excavation, backfilling, compaction, and foundation preparation.
Concrete Works: Overseeing formwork, steel reinforcement (rebar per BBS), concrete pouring, and curing for all structures.
Structural Construction: Ensuring correct construction of all plant buildings and process tanks (e.g., aeration, clarifiers).
Pipelines & Drainage: Managing installation of all underground and above-ground piping and drainage systems.
Quality Control: Implementing and monitoring quality assurance for all civil activities and materials.
Quantity Surveying (QS): Managing BOQ, BBS, progress valuations, and cost control for civil elements.
HSE Compliance: Ensuring strict adherence to health, safety, and environmental regulations on site.
Coordination & Reporting: Liaising with other disciplines and reporting on civil work progress.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
camp renovation
1. Responsible for overseeing civil works, including hollow block installation, tile work, Curb wall construction, chamber preparation, and primarily asphalt work for camp access roads
Monitor and review subcontractors’ work to ensure compliance with quality standards and report progress to the company.
Conduct daily Toolbox Talks (TBT) to promote safe working practices and maintain high-quality standards on-site.
Prepare daily work schedules and plans for the following day’s activities to ensure efficient workflow.
Possess significant expertise in asphalt work, which is a major component of the project.
Familiar with the company’s main scope of work, which includes repairing portable cabins (doors, windows, air conditioning systems, flooring, ceilings, partitions, and painting) as well as shed construction for diesel generators (DG) and car parking areas.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
gas storage phase 1 downstream pipeline
- Communication
- Technical knowledge
- Time management
- supervision
- Quality control
- Worked with subcontractor on Aromco pipeline project, focusing on
backfilling.
- Contributed to successful project completion through efficient
backfilling.
- Knowledgeable about NDT tests including RT, hydrostatic test,
AUT, and welding processes.
- Supported contractor in meeting quality standards with expertise
in NDT and welding.
- Experienced in pipeline maintenance using cathodic protection to
prevent rust.
- Maintained adherence to Aromco's strict quality control
procedures.
- Contributed to pipeline installation by assisting with pipe wrapping,
blasting, and FOC laying.
- Ensured pipeline integrity and durability through effective coating
procedures.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
dnc hostel gov of tamilnadu⁹
- team work
- communication
- Time management
- Organization
- supervision
- Technical knowledge
- BIM
- construction
- Blueprint reading
- Quality control
- Bar bending schedule
- material calculation
- Conducted site surveys, cleared site, and excavated trenches for
foundation.
- Marked building footprint and poured concrete for foundation.
- Erected columns, beams, and slabs to form building's skeleton.
- Constructed walls with bricks or blocks, installed lintels and arches.
- Built roof frame and installed roofing material.
- Applied plaster to internal and external walls.
- Painted walls, laid flooring, installed electrical and plumbing systems.
- -Constructed water sump and septic tank.
- Installed gutters, downspouts, and rainwater collection system.
- Conducted final inspections and handed over building to owner.
Impacts:
- Obtain more information about the building
- Learn how to control labour and clients
- Understand framed structure and reinforcement design
- Learn rebar detailing
- Find out how to use materials
- Determine if the quality of materials is good
- Determine which tests to conduct on materials