Jaikeshore
Senior Estimation Engineer at Link Middle East Limited
- JEBEL ALI FREEZONE AREA, DUBAI, UNITED ARAB EMIRATES
- keshore89@gmail.com
- +971523998707
Estimation Engineer with 14+ Years' Experience | Record of Excellence in Resource Planning and Project Estimation | Flexible to Budgetary Adjustments
Experience
Senior Estimation Engineer
Responsible for Estimation, Design Development / Drawings, Preparation & development of Techno Commercial proposals, Submission of Tenders, Technical Documents, Coordination with Sales Team. Recording and analyzing of Tender / Inquiry documents and writing for clarifications to the clients and the consultants. Preparing Pre-Qualification documents
Estimator & AutoCAD Draughtsman (For Elevators & Escalators)
Preparation of BOQ, Cost Estimation & Submitting the Drawings (2D, 3D & Isometric Views) using AutoCAD to client for approvals. Preparation of Layout drawings based on the Client Documents. Submission of Technical & Commercial Bid Submission. Ensure the resources are managed and deadlines are met.
Estimator & AutoCAD Draughtsman (Interior Design Department)
Site Visit & Taking site Measurements, Estimation based on the site condition & Preparation of Bill of Quantities. Submitting the Drawings (2D, 3D & Isometric Views) using AutoCAD to client for approvals.
Projects
security fence system for etihad railway project
- microsoft office
- autocad
- primavera
- solidworks
- adobe suite
Estimation for Fence System and Gates
- Work List:
- Measure area and determine layout
- Survey grounds
- Obtain necessary permits
- Choose materials
- Install posts and secure them
- Install bars and lattice
- Install gates
- Paint or finish material
- Finish up the project and clean up area
- Estimation for Fence System
- Increased security and privacy
- Better barrier against vandalism
- Estimation for Gates
- Ease of access to property
- Added expense for additional secure entry system
- Potentially increased privacy violation risk
Security Fence System and Instomate Gabions for United Arab Emirates Defence
- microsoft office
- autocad
Security Fence System & Instomate Gabion Box
- Design and develop a High security Perimeter fence system with modern Sensor technologies, suitable for the United Arab Emirates Defence/Military.
- Procure and install the necessary equipment and materials to install the High security Perimeter fence System
- Create and maintain a maintenance plan for the security fence system.
Impact:
- Reduced construction time with the fabrication team.
- Reduced cost with integrated systems
Burj Khalifa & Dubai Mall - Elevators & Escalators
- autocad
- microsoft office
- Mention key responsibilities that match the project description. Include explanatory phrases which includes why, how, where and how tasks are performed. Example: Managed a team of 5 sales reps to deliver monthly business targets.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
