Karthik GR
Senior technical Manager at Microvillage communications pvt ltd
- Bangalore, Karnataka, India
- karthikgr2611@gmail.com
- 9741811177
Innovative and self-motivated professional with stellar problem-solving skills and a passion for acquiring new knowledge. Seeking to join an organisation that values ideas, provides opportunities for growth and utilise skills to contribute to its success.
Experience
Senior Technical Manager
My role is to manage my team all over South Asia countries by providing technical support to our partner Whenever they face issues in configuring or implementing VoIP solutions to their customers and the Company specializes in the sales and distribution of voice, video and data IP products specific to communication and security.
Technical Manager – Smart Home Automation.
Company is in the field of Smart Home automation, Expertise in Intercom systems, Security & surveillance systems, Video door phone systems, Lighting, AC & Home theatre control systems, etc., deals with brands like, Grandstream networks, Ubiquiti, Sonos, Remotech, Z-wave Products, Arlo, etc.,
Senior Electrical engineer – Trainee (probationary period)
Company is in the field of CNC machines, Spindle machines, SPM machines manufacturing systems with latest technology on Drilling, grinding, milling, etc., They work for TVS (hosur), Nascom (Hyderabad), Aurolab(Madurai), BMW and PPC precisions ltd.
Project Engineer – Automation
Company is in the field of Process automation, Plant automation and measurement systems with latest technology. They work for Renault Nissian, Ford Sanand, Euro shoes, ABB india and Supreme treves.
Project Engineer – Electrical PE
Company is in the field of Electrical and instrumentation development. They work as contractors for L&T, Degremont india & Schneider Electric.
Projects
GMR Goa Airport , MOPA
.
- Designing:
- Brainstorming to create an effective design for SIP speakers, IP phones, GSM gateway and IPBX configuration
- Proposing the detailed plan for required components
- Drafting a layout plan for the corresponding devices
- Planning:
- Collating necessary resources required for the setup
- Researching the best market solution for the components
- Arranging vendors or online shops for purchasing the components and devices
- Installation & Configuration:
- Setting up the SIP speakers and IP phones
- Configuring GSM gateway and IPBX according to the pre-designed plan
- Establishing connections among the components
- Testing the setup to ensure the successful installation & configuration
- PA Announcement System:
- Integrating PA system to the setup
- Connecting PA system to the existing components
- Configuring the software to enable broadcasting announcements
- Execution:
- Deploy all necessary components in the target premise
- Integrating them together and deploying connections
- Testing everything to ensure the setup is running correctly
by Coordinating with Contractors
- Designing, planning, Installation and configuration of SIP Speakers, IP phones, GSM gateway, IPBX configuration. PA announcement System.
- Execution by coordinating with Contractors
Telugu Desam Party Headoffice, Vijaywada
Designing
- Planning requirements
- Researching vendors
- Drafting technical specs
- Drawing up schematics
Planning
- Establishing a timeline
- Developing a budget
- Scheduling resources
Execution
- Ordering and procuring equipment
- Configuring and testing equipment
- Troubleshooting hardware and software
Installation
- Installing hardware and software
- Connecting components in the system
- Loading initial software and updates
Commissioning
- Performing initial tests & checks
- Identifying and rectifying glitches
- Demonstrating functioning
- Finalizing user manual
- Designing : Created system blueprints, processes, and workflows to ensure the project's successful completion.
- Planning : Developed milestone roads maps and allocated resources to complete tasks in a timely manner.
- Execution : Executed the installation and commissioning of IPBX, IP phones, CCTV Sip supported Cameras, Wifi Access points, Video door access systems, etc.
- Installation : Configured, tested, and integrated the equipment to ensure that the system met the customer's standards and expectations.
- Commissioning : Assisted in the configuration of the new systems and verification of all components.
Studio Room For Reva University
Planning:
- Research latest technology available for studio setup
- Analyze space to determine size and type of Led Wall display
- Compare product features for various Led Wall display models
- Determine budget allocation for all studio setup
- Develop detailed installation plan
Executing:
- Purchase and receive materials
- Arrange professional installation of Led Wall Display
- Assemble studio furniture including cameras, lights etc.
- Connect components to configure complete studio setup
- Test equipment and programs for correct functionality
Impact:
- Quick and successful setup for studio room with latest technology
- Smooth installation of LED wall display on campus
- Increased efficiency, effectiveness and performance of the studio
Smart IT Infrastructure - Raffles park
- Smart FTTH Infrastructure
- Design of Fiber-to-the-Home (FTTH) Network
- Setup broadband connection in each villa
- Implementing passive and active optical network components
- Supporting secure data transmission
- Security and Surveillance Solutions
- Designing security and surveillance system
- Including CCTV cameras and access systems
- Remote security monitoring capabilities
- Wi-Fi Solutions
- Designing Wi-Fi networks for each villa
- Establishing wireless access nodes
- Ensuring optimal connectivity performance
- Offering support for different Wi-Fi standards
- Video Door Phone Integration
- Design of video door phones
- Integration of video door phones with the existing infrastructure
- Facilitating two-way audio-video communication
- Setup IP cameras in each villa
Impact:
- Improved FTTH infrastructure for villas
- Enhanced security and surveillance
- Enhanced WiFi connectivity for villas
- Integrated video door phone
Gluing Process for Automobile Head light Lamp-NEOLITE ZKW india pvt ltd,
- React
- HTML
- CSS
Work
- Develop the program for Siemens S7 300 to enable communication with the Profibus network for gluing process on Reinhardt, Germany machine
- Set up Profibus network for communication between the gluing machine and ABB robot controller
- Programming on Siemens S7 300
- Communicating the gluing machine (Reinhardt, Germany) with Profibus network for gluing process to head light lamps
- Communicating with ABB robot Controller with Profibus network
DME meter fixing for the drinking water for BWSSB , Bangalore-L&T
- Dismantling the pipeline:
- Turn off the main switch
- Close the inlet and outlet valves
- Disconnect the pipe joint
- Remove the pipeline from the ground
- Fixing the DME meter:
- Check the wiring of the meter
- Replace the battery
- Test the meter for accuracy
- Calibrate the meter as needed
Impacts:
- Dismantling the pipeline:
- Cost of repairs
- Service interruption
- Fixing the DME meter:
- Improved accuracy
- Reduced energy costs
Chlorination system installation for 175 MLD water treatment plant-L&T
, wiring and termination
Installation of LCP and ACP panels
- Room measurements
- Panels positioning
- Erection and anchoring
- Connectivity to main power
- Check and verify
Cable tray erection (300 mm, 100 mm)
- Measure and cut
- Assemble parts
- Secure tray using anchor bolts
- Lay the cables
LT and communication cable laying
- Measure distance and cut cables
- Place cables in the conduit
- Draw cables
- Join the cables
- Secure the cables
- Label the cables
Wiring and termination
- Connect appropriate wires
- Remove the insulation
- Connect the switches and light fitting
- Connect the neutral wire
- Tighten the screws
- Test the circuit
- Installation of LCP and ACP Panels
- Cable Tray Erection (300 mm, 100 mm)
- LT and Communication Cable Laying
Impact:
- Increased reliability of electrical systems through the installation of proper protective encasements.
- Reduced cable assembly time and labor costs through the erection of cable trays.
- Faster installation of electrical systems through the laying of LT and communication cables.
Electrical and Instrumentation work for 175 MLD water treatment plant- Degremont india
- Erection
- HT, LT PCC, MCC, LDB, SLDB, Control Panel, Valve DBs, EF DB
- 4500 & 630 KVA Transformer & Bus Duct
- LCP & ACP for Chlorination System
- All Electrical Panels
- Commissioning
- Testing
- Supervising
- Manpower Planning & Execution
- Purchasing Materials for Project
- Inspection
- HT & LT Power Cable Laying & Termination
- Lighting & Earthing
- Site Execution
- Billing
- Erection and commoisioning of: HT, LT PCC, MCC, LDB, SLDB, Control Panels, Valve DBs and EF DBs
- Installation of: 4500 & 630 KVA Transformer and Bus duct
- Installation of: LCP and ACP for the Chlorination System
- Testing of: All Electrical Panels
- Supervising of: Manpower Planning and Execution
- Purchasing of: Materials for Project
- Inspection of: HT and LT Power Cable Laying and Termination
- Erection and Inspection of: Lighting and Earthing
- Site Billing and Execution