Jaghadheesan P
Assistant Manager at Sakthi Auto Component Ltd
- Salem, Tamilnadu
- jaghadheesan@gmail.com
- +91 99424-16153
Results-driven NDT Assistant Manager with 20 years in the automotive industry, adept at implementing and managing Non-Destructive Testing programs. Seeking a challenging managerial role to contribute NDT expertise and drive excellence in inspection and testing processes.
Experience
Assistant Manager quality control
As the NDT Assistant Manager at Sakthi Auto Component Ltd, Tirupur, I led a team of NDT technicians, performed ultrasonic, radiographic, magnetic particle, and penetrant testing on automobile components. I developed and implemented NDT procedures, ensured compliance with industry standards, and collaborated with cross-functional teams to integrate NDT processes into the quality management system. Additionally, I conducted regular training sessions for NDT technicians, managed and maintained NDT equipment.
Junior Engineer Hardness and Heat Treatment
As a Hardness and Heat Treatment Junior Engineer at Sakthi Auto Component, I performed heat treatment processes on cast iron steering knuckles, monitored and controlled heat treatment equipment, conducted comprehensive hardness testing, and developed and implemented quality control procedures to ensure adherence to hardness specifications and industry standards. I also collaborated with foundry teams to optimize casting and heat treatment processes for improved hardness properties.
Trainee Visual Inspector
As a Visual Inspector Trainee at Sakthi Auto Component Ltd, I assisted in visual inspections of cast iron components, conducted routine checks on molding and casting processes, collaborated with senior inspectors to ensure adherence to quality specifications, and maintained accurate inspection records and documentation for quality control purposes. I also participated in training programs to enhance visual inspection skills and knowledge of cast iron foundry processes.
Awards
Operational Efficiency Enhancement
Successfully implemented a new fixture design, leading to a significant reduction in inspection time and a notable enhancement in overall operational efficiency.
Production Process Optimization
Streamlined production processes, resulting in a simultaneous increase in output quantity and a considerable reduction in cycle time.
Innovative Program Modifications
Achieved seamless integration of a new component through innovative program modifications, eliminating the need for external support and ensuring a smooth operational transition.
Financial Benefits through Cost Savings
Spearheaded cost-saving initiatives within the company, coupled with the successful implementation of a modified program, resulting in substantial financial benefits and improved overall profitability.