A self-motivated Mechanical Engineer with 4 years of experience in project management and site engineering. Skilled in budgeting, resource planning, forecasting, project development and risk management. Experienced in training and motivating diverse teams to achieve successful projects.
Experience
Site Incharge
Provided guidance and ensure engineering quality design and compliance with client requirements, local design guidelines, local codes, international codes and international standards of independent engineering firms that are carrying out the detailed engineering design.
GRADUATE ENGINEER
Participating in meetings, workshops and team-building events. Taking notes on experiences and keeping a lot of things learned.
Compiling reports and making presentations to other staff members. Analyzing existing systems and offering new ideas for improvement.
Projects
45 klpd distillery expansion plant
- manpower recruitment
- contractor finalization
- commercial activities
- mobilization of site
- safety permit
- I have started this site as a first-person as site in charge.
- Arranged for Form V from the client to apply for a labour license.
- Arranged for labour entry and machinery entry with required pre-check activities.
- Arranged TPI certifications for all lifting items and safety items.
- Listed safety items required for the site and took quotes from various vendors.
- Started fabrication activities at the site and moved towards the timely completion of the Project.
I have mobilized the site successfully and the fabrication work has been started
Enhancement of 100 KLPD AA to 240 KLPD distillery
- execution
- quality and safety assurance
- crane handling
- scheduling and tracking
- subcontractor billing
- scrap handling
- Mobilized the site with Men, Machinery and materials.
- The site is very congested for erection activities and is in a hazardous area as we have only a small clearance between the existing ethanol plant and the new plant. So I took safety measures by doing barricading work throughout the existing plant.
- Arranged materials according to the sequence of erection activities to maintain the project schedule.
- Organised toolbox talks and safety committee meetings.
- Completed all the execution activities in 8 months.
- We have successfully achieved 99.98% strength Ethanol.
- We have achieved 1,25,000 safe manhours.
120 KLPD AA Multifeed distillery plant
- site execution
- qms offer
- In the middle of the project, I was deputed to handle fabrication and erection activities in the evaporation section.
- Critical safety measures were taken as the execution activities were near the existing ethanol plant.
- The Evaporation plant was successfully commissioned.
- We have achieved 7 Lakhs safe manhours.
67.5 KLPD Distillation section
- construction management
- material handling
- execution with layout/ civil/ structure/pid/pga/sga/sfd drawings
- The first individual site was given to me. I was appointed as the site in charge.
- Managed the site as per the schedule with timely arrangement of materials and manpower.
- Responsible for overall site execution as per fabrication & erection drawings of the distillery plant.
- Project scheduling and tracking of the work progress and update to client and PM.
- Execution of site with SS/MS tank fabrication, Structure fabrication and
- Erection, Static equipment installation, Piping (SS, MS & IBR) & Painting.
- Studying drawings and indenting for excess materials.
- The project was done as per the schedule and the client was very interested in providing an individual certification for this achievement.
200 KLPD Distillery plant
- store management
- weekly progress reports
- This is the 1st site at PRAJ.
- I was to be reported to the site in charge.
- The responsibilities are in the side of materials and specific site activities.
- Completed the commissioning activities and moved on to the next site.
turnaround in refinery-1 (piping)
- project planning
- To update daily progress report to client and PM by observing the fit-up and welding activities with the help of Piping Isometric drawings.
- To segregate the shop and field welding joints by identifying the erection area by using piping Isometric drawings and General assembly drawings.
- To monitor subcontractor’s activities and assign them work according to the sequence.
- To plan the Non-shutdown piping erections by verifying with the site location to minimize the Shutdown time of the customer and Reconciled the materials provided by the client.
- The client was satisfied with our execution activities provided the work was done with assuring quality and zero accidents.
1*20000mt additional ammonia tank
- To perform QA/QC activities like MPT, DP and RT and perform repair works.
- To maintain QA/QC activity reports.
- To check and certify the subcontractor bills.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
Awards
Electro Mechanical completion of distillation plant
On successful erection and commissioning of 67.5 KLPD distillery plant M/s Bannari Amman sugars has issued completion certificate.