Naga Nathan
Deputy Manager at M/s Flsmidth Private limited
- Chennai, Tamilnadu, India
- vkjana.12@gmail.com
- +918056457491
Seeking Leadership Role to Leverage Knowledge and Skills in Esteemed Organization
Experience
Electrical, Instrumentation, Control system Engineer (Deputy Manager)
Apr 2013 – Sep 2022
EPC, Supervision of Cement/Minerals projects.
Areas Handled in Minerals: Material Handling (Including the stacker/reclaimer machines), Mines, Petcock, Alumina&Aluminium plant, Crushers, FLS Products like thickener, kiln, cooler, etc.,
Areas in Cement: Experienced in all the areas which are related to the E&I part.
Electrical and instrumentation engineer (Senior Engineer)
Mar 2012 – Mar 2013
Handling the Cement plan Erection, Testing, and Commissioning.
Electrical Enginner
May 2010 – Feb 2012
Erection, Testing, and commissioning of cement plant and power plant.
Projects
sanvira petcoke, llc, oman
Work List:
- Supervision :
- Creation/development of Process Flow Diagram
- As-built Functional Detail Design
- Validation of Process and Graphics
- Piping and instrumentation diagram design
- Safety system design review
- System start-up and commissioning
- Operator training
- Commissioning:
- Execution of pre-commissioning activities
- Installation and commissioning of plant
- Preventive maintenance
- Inspection and testing
- Start-up and operation
- Developing standard operation procedures
- Developing preventive maintenance checklists
- Root cause analysis
Impact:
- Supervision of petcock plant
- Commissioning of petcock plant
grinding mill, dryer, odisha
Supervision
- Confirming proper installation procedures
- Monitoring operation of kiln and grinding mill
- Ensuring that all safety protocols are adhered to
- Making adjustments and repairs as needed
Commissioning
- Planning and organizing the commissioning timeline
- Testing the functioning of all components
- Recording and analyzing data
- Performing preventive maintenance and repairs as required
Impact:
- Improved mill performance
- Enhanced kiln efficiency
- Reduced commissioning time
power plant, material handlling, aligarh
- Erection
- Stacker
- Reclaimer
- Substations
- Conveyors
- Testing
- Stacker
- Reclaimer
- Substations
- Conveyors
- Commissioning
- Stacker
- Reclaimer
- Substations
- Conveyors
- Erection of Stacker, reclaimer, Substations, conveyors etc.
- Testing of Stacker, reclaimer, Substations, conveyors etc.
- Commissioning of Stacker, reclaimer, Substations, conveyors etc.
cement plant, nepal
- Cement plant supervision and commissioning
- Stacker/ reclaimer/ CB cooler Erection and commissioning
- Vertical mill (ok/ Atox mill), kiln commissioning
- 33KV/6.6KV substation commissioning
- HT/LT/VFD Motor commissioning
- HT/LT panel Scheme verification and commissioning.
- Cement Plant related all the instrument Installation supervision and commissioning.
- To complete the project in projected time frame
Madden Phosphate, Saudi
Supervision
- Ensure wet plant setup is installed correctly as per design and specifications
- Supervise installation of electrical/control systems
Commissioning
- Carry out commissioning activities of wet plant.
- Verify the operation of various pumps, motors, and other auxiliary wet plant components.
Material Handling
- Supervise the loading of various types of equipment like conveyors, Stack loaders.
- Monitor the handling of materials to prevent damage.
Cone crushers
- Supervise the commissioning of cone crushers.
- Ensure cone crushers related to Electrical and instrument are installed in accordance with design and installation requirements.
- HT panel Hook up and charge the 4.5KV substation.
- LT MCC Hook up and commissioning of panel
- HT motor and TRAFO testing and commissioning.
- Supervision and commissioning of Wet Plant
- Material Handling
- Cone Crushers
Utkal Alumina, Odisha
- React
- HTML
- CSS
- Mention key responsibilities that match the project description. Include explanatory phrases which includes why, how, where and how tasks are performed. Example: Managed a team of 5 sales reps to deliver monthly business targets.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
Dalmia Cement, Midinapur
- Mention key responsibilities that match the project description. Include explanatory phrases which includes why, how, where and how tasks are performed. Example: Managed a team of 5 sales reps to deliver monthly business targets.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
Riddhi siddhi Cement, Nepal
- Mention key responsibilities that match the project description. Include explanatory phrases which includes why, how, where and how tasks are performed. Example: Managed a team of 5 sales reps to deliver monthly business targets.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
Hindustan Zinc Limited,Rajasthan
Work list:
- Mud Classifier commissioning:
- Electrical commissioning
- Instrumentation commissioning
Impact
- Reduced downtime during commissioning
- Improved efficiency of commissioning activities
- Streamlined operation of electrical and instrumentation systems
- ABB VFD Commissioning
Sagar Cement, AP
- Mention key responsibilities that match the project description. Include explanatory phrases which includes why, how, where and how tasks are performed. Example: Managed a team of 5 sales reps to deliver monthly business targets.
- Mention measurable impact or results you helped deliver. Focus on the outcome of tasks. Example: Modified customer service support system to reduce complaints by 10%.
